HARBAUER Water Treatment
References
 
Project Duration Process Through-put [m3/h] Contamination
DEA Minol,
Neubrandenburg
11/92- 02/93 desorption activated carbon 15 TPH, BTX
 
Birkbuschstraße, Berlin 07/92 -10/92 oil separator activated carbon 8 TPH, halogenated volatiles
Schering II, Berlin 02/93 -02/94 desorption waste gas catalysis 10 vinyl chlorides
Lausitzer Hof, Cottbus 03/93 -11/93 desorption neutralization 200 halogenated volatiles
Shell Gas station, Potsdam 04/93 -07/93 oil separator desorption activated carbon 15 TPH, halogenated volatiles
Berliner Straße, Potsdam 06/93 -12/93 activated carbon
 
55 TPH, BTX, PAH
Madlow, Cottbus 07/93 -03/94 activated carbon
 
70 TPH, BTX, PAH, halogenated volatiles
Schlesischer Busch, Berlin 08/93 -01/94 desorption 165-300 halogenated volatiles, reinfiltration
Lise-Meitner-Str. , Berlin 07/93 -08/93 activated carbon 55 phenole, PAH
Bundesdruckerei, Berlin 11/93 -03/94
 
oil skimmer activated carbon skimmer system 10 TPH, Xylol
Disposal site, Kleinmachnow 11/93- 12/93 activated carbon 10 TPH, phenole
IFA, Halle7, Ludwigsfelde 10/93 -10/95 soil air venting oil separator solvent recovery soil air halogenated volatiles, TPH
Schering III, Berlin since 03/94 desorption waste gas catalysis 5 halogenated volatiles, vinyl chlorides
IFA, Halle 4, Ludwigsfelde 03/94 -12/94 activated carbon 10 TPH, BTX
Bundesdruckerei II , Berlin 03/94- 06/94 desorption reinfiltration 300 halogenated volatiles
Alte Jakobstraße, Berlin 04/94 -09/94 desorption activated carbon 180 halogenated volatiles
Bautzener Straße, Berlin 09/94 -11/95 precipitation ion exchanger reinfiltration 32

heavy metals, As, chrome, copper, boron